Skip to content

Update Fault Proofs Notice Page #687

@cpengilly

Description

@cpengilly

The changes and feedback needed are for this page:
https://docs.optimism.io/builders/notices/fp-changes

Changes:
Callout at top: launch message to reflect “Summer 2024”. (Remove Sepolia messaging.)
Callout at top that withdrawals put in right before the upgrade will need to be resubmitted post-upgrade.
New section: changes to withdrawal times and process, w.r.t. the max time is longer.

New Callout in “For Bridges and CEXes” section:
IMPORTANT NOTE FOR BRIDGES: Withdrawals that haven’t finalized before the upgrade occurs will be unable to be finalized post-upgrade without resubmitting. This means these withdrawals will need to go through a new 7-day period. The time accrued before the upgrade will not count.
This means the withdrawal time could be as long as 13-14 days during the upgrade window. (If you submit it ~6 days before the upgrade, then must re-submit after the upgrade, you will have to wait a new seven days.)

Metadata

Metadata

Assignees

No one assigned

    Labels

    documentationImprovements or additions to documentation

    Type

    No type

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions